双赢彩票安卓版在线娱乐:双赢彩票正规吗

双赢彩票正规吗 > Solution > Reference Project > Oil & Gas and Mining >

KUSH Project

双赢彩票正规吗 www.l8f2q.com.cn Client:

Location: North of Khartoum , Sudan

Project Scale: 2860 m2 in area over roof

Period: 2015/01-2015/03

Project Name: KUSH Project

Project Description

Ark provides modular building solutions for a wide variety of industries. We serve as your general contractor, offering an alternative to traditional construction methods and providing complete support on each project.

Kush project was another turn-key case to Ark for a mining giant company from Russia.


Kush camp consists of a whole prefab building made up of 10 sub-blocks, including Office Block, VIP Block, 2-people Block, Kitchen & Mess Block, and six 4-people Blocks, all of which had been linked together with corridor units.

Among them, there were 2 VIP rooms (exclusive sanitary rooms with water heater) and 16 x 2-people rooms both of which were accommodated with TV sets, 60 x 4-people rooms, 8 x lockers rooms, 4 x storage rooms, 4 x laundry rooms with 16 washing machines, 5 x toilets rooms and 5 x showers rooms. All sleeper rooms had been accommodated with King Beds (for VIP and 2-people rooms) and Bunk beds (for 4-people rooms), writing desks and chairs, and AC sets.


In the Office Block, there are Boss Office, Conference rooms, Managers Offices and Public Offices. Each of the office room had been furnished with office desks and chairs, and filing cabinets. The communication control room, including the fire alarm control unit, was also stationed within this building.


In the Kitchen & Mess Block, kitchen equipments including the refrigerators, kitchen fan, and electrical ovens had been properly layout and connected to power; so were the dining table and chairs.


There was one secondary level general power panel for each two sleepers block, with Office and Kitchen & Mess blocks their own ones. In addition, there was one 300L water heater supplied in each showers room.


As a whole building with long straight corridors, Kush camp is resistant to the extremely hot weather and dusty environment on site.


The client was satisfied with the camp building’s finishing work, for which they were eager to move in. Due to the flexible function of Ark modular cabins, the client also wants to change the lockers’ rooms into sleepers rooms to increase the volume of accommodated persons.



------分隔线----------------------------
Copyright © Ark Prefab Co., LTD. Contact US ? ARK Company ? 双赢彩票正规吗 ? Sitemap
  • 开启人才成长之门——与时代同行的高考改革 2019-05-23
  • 上海合作组织成员国元首理事会青岛宣言 2019-05-22
  • 壮阔东方潮 奋进新时代——庆祝改革开放40年——山西黄河新闻网 2019-05-22
  • 中央纪委紧盯节点 4年来通报曝光问题近4000起 2019-05-21
  • 元宵诗情中的文化认同 2019-05-21
  • 中国这次强硬反击,传递了四个意味深长的信号! 2019-05-20
  • 巴西4月汽车销量大幅攀升 2019-05-20
  • 新科欧洲状元 五盾军团能否延续法兰西之夏荣耀 2019-05-19
  • 《人民日报》与红旗渠 2019-05-19
  • 女神范的许晴坐高铁 脱下一只袜子当眼罩 2019-05-18
  • 一封请战书 一片赤子情 2019-05-17
  • 告别青春,东风日产奔“三”之路如何走? 2019-05-17
  • 【华商侃车NO.191】大家开车抢黄灯吗? 2019-05-16
  • 邢台市紧盯扶贫领域腐败和作风问题 斩断伸向扶贫领域的“黑手” 2019-05-16
  • [微笑]哇,才离开一会儿就这么多赞了?好久没得这么多赞了也!看来还是支持的人占多数嘛! 2019-05-15
  • 706| 876| 345| 469| 816| 890| 404| 911| 461| 791|